Main Base Camp

Fair Future Foundation, Kawan Baik Indonesia, Action For Fair Future, No Problem TV, Kawan Baik, Kawanbaik.co and Fair Future Indonesia

Jalan Danau Poso No.51A
Banjar Semawang Sanur
80228 Denpasar Selatan
Bali - Indonesia

No Problem TV, Kawan Baik and Fair Future Indonesia

Our address

Fair Future Foundation, Action For Fair Future, No Problem TV, Kawan Baik, Kawanbaik.co and Fair Future Indonesia and Epi Production

Jalan Danau Poso No.51A
Banjar Semawang Sanur
80228 Denpasar Selatan
Bali - Indonesia

Sumba Base Camp at Rumah Kambera

Sumba Base Camp

Fair Future Indonesia and Kawan baik Indonesia

Jl. S. Parman
kampung Praikundu
87115 Kambera
Nusa Tenggara Timur - Indonesia

Sumba Base Camp

Fair Future Indonesia and Kawan baik Indonesia

Jl. S. Parman
kampung Praikundu
87115 Kambera
Nusa Tenggara Timur - Indonesia

Donate offline

Make a bank transfer to one of our Swiss bank accounts!

How are you today? I am Elisa and I joined the board of the foundation -secretary and treasurer- in October 2019 and the teams of the foundation in Indonesia, on February 2020 as a volunteer for the Fair Future programs.

If you want to make a donation by bank transfer, there are our bank details in Switzerland

Fair Future Foundation
Route d’Yvonand 8B – 1522 Lucens (VD) – Switzerland
Banque Cantonale Vaudoise (BCV)
IBAN : CH 83 0076 7000 e543 5802 2
Bank clearing: 767
BIC/SWIFT: BCVLCH2LXXX

Fair Future Foundation
Route d’Yvonand 8B – 1522 Lucens (VD) – Switzerland
Credit Suisse Bank
IBAN : CH64 0483 5143 7008 9100 0
Bank clearing: 4835
BIC/SWIFT: CRESCHZZ11A

Thank you very much for helping us and see you very soon.

Localisation of this project

Mbinundita - Where we are rebuilding the new School for 65 kids.

Here the foundation has built a school of 5 classes, for levels 1, 2 and 3. That is to say children ages 8 to 10 years old.

This construction is the result of intense work and permanent involvement of the foundation on the ground. The success is there and now more than a hundred kids go there every day.

This new school is made to last over time, so that entire generations of children can learn here in MbinuDita … In the middle of nowhere.

Date / period of realisation

Start of the study: January 2020 | Start of works: August 2020 | End of Work: December 2020

The school collapsed and was 100% destroyed by a storm on December 19, 2020. The foundation reacted immediately and decided to rebuild it. But the COVID-19 pandemic has been there …

Technical planning, architectural plans, coordination and ordering of materials began in January 2020, the start of construction in August 2020 and the end of work was celebrated in mid-December 2020.

Here the foundation has built a school of 5 classes, for levels 1, 2 and 3. That is to say children ages 8 to 10 years old.

This construction is the result of intense work and permanent involvement of the foundation on the ground. The success is there and now more than a hundred kids go there every day.

This new school is made to last over time, so that entire generations of children can learn here in MbinuDita … In the middle of nowhere, on the top of one of the highest hill of East Sumba.

Detail of this project

The project

Feasibility and demographic studies for the construction of a new (permanent) school, comprising at least 3 classes, in order to educate more than one hundred children aged 8 to 10 years. School building.

Number of beneficiaries

About 15,000 inhabitants. In favour of the entire population of this ultra rural region of Sumba-Est. Children of the region, families to develop eco-friendly activities for a better life.

The proposal

Please download it to read it.

Final Report

Download the finale report here, in .PDF format.

The movie of #RebuildMbinuDita

Click here to watch the story on this incredible journey!

5 pictures of the project

The cost of the project

Total amount of this project

In Swiss Francs (CHF)

Funded by Fair Future

In Swiss Francs (CHF)