
Wasser, Energie und Infrastruktur
Rumah Kambera
A permanent community socio-medical centre in Kawangu, built to strengthen care, medicine supply and field logistics across East Sumba.
- A field base since 2019
- 4,200 m² site in Kawangu
- Phase 1 is the next construction stage
A permanent place for care that must keep moving
Rumah Kambera is where programmes meet reality. Medicines are prepared here. Health agents train here. Vehicles leave for villages from here. Water and solar equipment are stored, repaired and sent into the field from here.
The rented base used since 2019 can no longer safely carry the scale of this work. On foundation-owned land in Kawangu, the future Rumah Kambera Community Socio-Medical Centre is being developed as a permanent operational base for community care, medicine supply, diagnostics and field logistics.
Project website · plans · 3D
See Rumah Kambera as it is being planned and built
The dedicated Rumah Kambera website brings the project together in one place: the interactive 3D model, new architectural views, construction phases, current works and project updates from Kawangu.
Four architectural views from the October 2026 SketchUp series. The full project record and interactive model are available on the dedicated website.
Das Programm
The place where separate programmes become one health system
Safe care in a remote district depends on more than a consultation. It depends on medicines that can be stored correctly, basic diagnostics, prepared teams, reliable logistics and a base able to continue through heat, rain and distance.
Rumah Kambera has operated as Fair Future and Kawan Baik Indonesia’s field base since 2019. It connects Primary Medical Care, Kawan Sehat agents, Water Connections, solar and electrification, prevention, research, emergency response and community activity.
Phase 1 is deliberately focused on the operational core. It is planned to include a pharmacy, a small laboratory, clinical space, medical storage, field-logistics areas, parking and sanitation. The workshop, expanded training areas and additional technical or community spaces belong to later phases as funding allows.
The centre will not replace hospitals or public health centres. It will make community care, preparation and referral safer, better supplied and easier to sustain.
Auf einen Blick
- Wo?Kawangu, Pandawai, East Sumba, Indonesia
- WerTeams and programmes working across a population basin of around 300,000 people. This is a catchment area, not a forecast patient count.
- Phase 1Clinical space, pharmacy, small laboratory, medical storage, field logistics, parking and sanitation
- StatusFoundation-owned land, site preparation under way and Phase 1 planned as funding allows
The present Rumah Kambera has supported medical supplies, training, coordination and daily field preparation for years.
The foundation-owned land is being developed for long-term medical, community and logistical use.
This figure describes the territory the centre can help support. It is not a forecast patient count.
Clinical space, pharmacy, small laboratory, medical storage, field logistics, parking and sanitation.
From site to service
A permanent centre built in useful phases
The project is being delivered step by step so that the first building can become operational without waiting for the whole centre to be completed.
Secure the ground
The foundation-owned site is surveyed and organised around access, drainage, existing conditions and East Sumba’s climate.
Establish essentials
Water, electricity, site preparation and a safe perimeter make construction and future daily work possible.
Build Phase 1
The first building is planned around clinical space, a secure pharmacy, a small laboratory, medical storage, field logistics, parking and sanitation.
Put the core to work
Medicines, diagnostics, stock systems, patient follow-up and mission preparation can begin from a permanent operational base.
Expand later
The workshop, expanded training areas and additional technical and community spaces can follow as financing allows.
Infrastructure is part of care
A stronger base, with clear clinical boundaries
Rumah Kambera will strengthen the first links in the care pathway: preparation, prevention, safe storage, early assessment, training, documentation and referral. It is designed to support formal services, not imitate or replace them.
What the centre can support
- Prepare medical outreach and appropriate first-line community care
- Store medicines and supplies in secure, traceable conditions
- Support defined basic diagnostics and water-quality analysis
- Train Kawan Sehat agents through practical sessions and case review
- Provide health education, community meetings and coordinated follow-up
- Prepare records, supplies and transport before teams leave for remote villages
What still requires formal services
- Emergency stabilisation, ambulance pathways and hospital admission
- Specialist diagnosis and treatment beyond the team’s competence
- Surgery, inpatient care and advanced laboratory investigation
- Government vaccination services and statutory disease surveillance
- Management of severe or uncertain illness requiring a higher level of care
- Referral decisions that must remain under qualified medical responsibility
Local work on the Kawangu site. The centre is being built from field reality, local skills and operational needs.
Inside Phase 1
A compact clinical and logistics core first
The first building is not the whole future centre. It is the operational core we hope to start first, with the spaces needed to keep medicines, basic diagnostics, clinical work and field missions organised in one place.
See the materials and technical choices being prepared for Building 1, including floor tiles, paint colours, doors and windows.
Clinical space
A small care area for appropriate assessment, follow-up and preparation before referral when needed.
Pharmacy & laboratory
Secure medicine storage alongside a small laboratory for defined basic diagnostic and analytical work.
Medical storage & logistics
Protected supplies, stock preparation and field-logistics space for teams leaving for remote communities.
Parking & sanitation
Practical access, loading space and safe sanitation are part of making the building usable every day.
Later phases: the workshop, expanded training areas and additional technical or community spaces will be developed as funding allows.
Welche Änderungen in der Praxis
The centre will turn distance into organised readiness
Medicines ready before departure
Secure storage, stock records and dedicated preparation space will reduce avoidable shortages, losses and rushed field departures.
Training becomes continuous
Kawan Sehat agents and local teams will have a permanent place to practise protocols, review cases and strengthen clinical judgement.
Water and health evidence meet
A small laboratory will help analyse water quality and connect technical infrastructure with infection prevention and measured health risk.
Local work builds lasting capacity
Local masons, carpenters, technicians, drivers, trainers, suppliers and health workers contribute skills that remain useful beyond construction.
Project PDF · EnglishRumah Kambera 2026Open the detailed 33-page project, including functions, technical principles, budget structure and long-term vision.
Projet PDF · FrançaisRumah Kambera 2026Ouvrir le projet détaillé de 33 pages : fonctions du centre, principes techniques, structure du budget et vision à long terme.
Technical planningBuilding from measured groundSee how elevations, drainage, roads and existing conditions were mapped before construction advanced.
Water on siteThe first physical stepFollow the drilling that found water and made construction, field life and future care possible on the new site.
Connected programmePrimary Medical CareUnderstand the community care, medicines, supervision and referral system the centre will help sustain.
Live FeldaufzeichnungFeldbesprechung aus OstindienFollow short, current observations from construction, medical work, water systems and daily operations.
Feldhandbuch & GlossarTerms behind the workExplore practical explanations of community health, referral, logistics, water safety, prevention and humanitarian infrastructure.
Live aus dem Feld
Rumah Kambera Field Notes, as the work happens
Two recent signals from Kawangu, construction, medical logistics, training or community work. These notes refresh when a relevant Field Note is published.
Direkt vom Feld
Latest Rumah Kambera reports
These reports document fundraising, construction, water, technical studies, local work and the programmes preparing to operate from the future centre.
Handwäsche Rumah Kambera beginnt mit sorgfältiger Planung
Rotary Australia, der Rotary Club of Mandurah Districts und John Kevan unterstützen die geplanten Handwaschstationen im neuen Kindergarten Rumah Kambera. Barrierefreie Waschbecken und Hygiene-Schulungen werden Kindern und Erwachsenen zugutekommen. Die Installation soll für 2027 geplant sein, die Standorte, die Wasserinstallation und die Kosten müssen noch festgelegt werden.
50 Lastwagen voller Sirtu sind jetzt vor Ort in Rumah Kambera
Fünfzig der geplanten 100 Lkw-Ladungen mit Sirtu sind bereits bei Rumah Kambera angekommen. Die Gruppe arbeitet von 6 Uhr morgens bis 20 Uhr und erhält täglich 25 Lkw-Ladungen. In diesem Tempo werden weitere zwei Tage benötigt. Anschließend werden wir entscheiden, ob weitere Materialien benötigt werden, bevor wir die 100 Stapel ausrichten und die Oberfläche so eben stellen, wie es möglich ist.
Rumah Kambera Die Grenzzäune sind fertig
Rumah Kambera Die Umfassungsmauer ist nach fast zweieinhalb Monaten fertiggestellt, einschließlich der Errichtung des zentralen Holzlagers. Nordostseitig ist nun die Ausgleichsverlegung geplant, wobei rund 100 Lkw sirtu mit etwa 20% Tonnen Material die Fläche von 4.200 m² für das zukünftige Medizinalzentrum um 50–60 cm erhöhen sollen.
Von Plänen zu Materialien bei Rumah Kambera
Eine architektonische Darstellung des Gebäudes 1 ist dem internen Bauplan Rumah Kambera beigefügt, der die Bodenbeläge, die Farbfelder, die Türen und Fenster für die medizinischen und Werkstattbereiche definiert. Einige Details müssen noch bestätigt werden, bevor die Arbeiten von den Zeichnungen in die Bauphase übergehen.
Die Endwand bei Rumah Kambera
Die Arbeiten an der letzten Seite der Rumah Kambera Umfassungsmauer laufen in Kawangu in Ost-Sumba. Die Mauer soll nächste Woche fertiggestellt sein. Anschließend sirtu wird eine Mischung aus Sand und Stein verstreut und verfestigt, um die schräg abfallende Nordostseite zu ebenen machen, bevor mit der Konstruktion im Zentrum begonnen wird.
Eine Website für das Future Rumah Kambera Centre
Eine eigene Website begleitet nun das geplante Rumah Kambera Gemeinschaftssozialzentrum in East Sumba. Die architektonische Darstellung zeigt das Konzept, während die neue Microsite die Ziele, Pläne und den Baufortschritt des Zentrums erläutert. Folgen Sie dem Projekt, während jede Phase Gestalt annimmt.
Elektrizität erreicht den Rumah Kambera Standort
Die Stromversorgung erreichte vor einigen Wochen die zukünftige Standort des Sozialmedizinischen Zentrums der Rumah Kambera Gemeinschaft in Kawangu in Ost-Sumba. Die derzeitige Anschlussleistung von 2.200 Watt ermöglicht grundlegende Bauarbeiten und sorgt für eine Abendbeleuchtung im Lopo, wenn das Team während des Bauprozesses über Nacht auf dem Gelände bleibt.
Rumah Kambera CHF 19.000 für das Future Centre
Zwei Spenden in Höhe von insgesamt 19.000 CHF bringen die Finanzierung des zukünftigen Rumah Kambera Gemeinschaftssozialmedizinischen Zentrums auf fast 40% die gesamte erforderliche Summe. In Kawangu, Ost-Sumba, wird an einem Standort, der für medizinische Versorgung, Ausbildung und Logistik für abgelegene Dorfgemeinschaften vorgesehen ist, gebaut.
Topografische Vermessung von Kawangu | Bauwerk aus gemessener Fläche
A topographic survey has been completed at the future FFF-KBI Sumba HQ site in Kawangu. Elevations, contours, roads, drainage and existing features were measured and mapped at 1 to 1000 scale, giving the project a reliable technical base before the next construction phase begins on site.
Rumah Kambera 2.0 Bohrungen beginnen | Fair Future
Rumah Kambera 2.0 drilling marks the first physical step toward Fair Future Foundation’s new socio-medical base in East Sumba. After two days of work, fresh water was found, making future construction, field life, and patient care possible on the site.
Soziomedizinischer Basiskonzept 2026 veröffentlicht in Sumba
The Sumba HQ Concept 2026 marks a decisive step forward. Rumah Kambera can no longer sustain our medical and social operations. Too small, structurally exhausted, and limiting our impact. With land secured in Kawangu, this new socio medical base is designed to strengthen healthcare access and long term field presence in East Sumba.
Ausbau des Lagers soll die Versorgung mit medizinischen Geräten und Laboreinrichtungen verbessern
Wir erweitern unser Lager in Rumah Kambera! Zunächst soll es medizinische Vorräte und 2.200 SolarBuddy Lampen von Rotary und SolarBuddy. Aufnehmen soll es auch ein kleines Laboreprojekt im Jahr 2025. Klicken Sie hier, um die Pläne anzuzeigen und zu sehen, wie dieses neue Gebäude unsere Mission unterstützen wird. Vielen Dank!
Fundraising and accountability
A centre is only credible when the work remains visible
We publish construction stages, technical studies, field use and funding milestones as the project moves forward. Because funding changes as new support arrives, the dedicated Rumah Kambera website now carries the current project record rather than fixing a percentage here that quickly becomes outdated.
Die completed boundary wall at Rumah Kambera marks a documented stage in preparing the site for the future centre.
















