A pupil at Laindatang school, East Sumba. Published on 27 January 2024.
Photograph in 1920 × 1080 format. Click the image to view it at full size.
A schoolboy looks around a classroom wall, with one hand raised near his face. This Picture of the Day, published on 27 January 2024, records a moment with one of the children at Laindatang school, East Sumba.
What the school was missing
Our January account described six classes and around 80 pupils, with no water supply, toilets, handwashing basins or electricity. Teaching materials and access to information were also limited. Those were the conditions behind the next stage of Water Connections.
For a child spending the day at school, water is needed for drinking and washing hands. Toilets need privacy, a safe way to manage waste and continued cleaning. These services are part of making a school usable throughout the day.
A programme still taking shape
The plans described in the report included sanitation facilities, eight handwashing points and water that pupils could take for the journey home. Drilling, storage reservoirs and distribution pipes were parts of the work needed to make those plans possible.
At that January stage, the project was still being developed. Later photographs in this series document construction and the facilities completed in March. They show the work that followed this moment: drilling, pipe-laying and building places for pupils to wash and use the toilet.
The boy’s look towards the camera is a moment from the school day. The responsibility behind our work is more concrete: make basic facilities available to him and the other pupils, and help ensure those facilities continue to serve them.
See the later photographs of the school’s handwashing station and the sanitation block.


