Work on the final side of the Rumah Kambera boundary wall is under way in Kawangu, East Sumba. The walls are expected to be complete next week. Then sirtu, a mix of sand and stone, will be spread and compacted to level the sloping north-eastern site before construction begins at the centre.
We have compiled a list of articles and pages for this topic
The Fair Future Foundation in East Indonesia combats social and medical injustice and aims to ensure everyone has access to healthcare, clean water, and education. Join us in making a difference.
Fair Future’s home base in East Sumba, a hub for field missions, logistics, and community support.
Socio-Medical Base Concept 2026 Released in Sumba
The Sumba HQ Concept 2026 marks a decisive step forward. Rumah Kambera can no longer sustain our medical and social operations. Too small, structurally exhausted, and limiting our impact. With land secured in Kawangu, this new socio medical base is designed to strengthen healthcare access and long term field presence in East Sumba.
Rumah Kambera Health and Community Centre
Rumah Kambera is Fair Future Foundation’s future Community Socio-Medical Centre in Kawangu, East Sumba. Explore Phase 1, the interactive 3D model, architectural plans and current construction updates.
Rumah Kambera medico social base in rural Indonesia
Provides a permanent medico social base in rural Indonesia, enabling healthcare delivery, medical logistics, training and emergency response in remote East Sumba villages where no public infrastructure exists. Rumah Kambera anchors long term humanitarian and medical field operations.
Rumah Kambera Ground Levelling Moves Forward
We ordered another 30 truckloads of sirtu for Rumah Kambera. Two full days of spreading in around 38°C heat, with a hired Hitachi mini excavator, have left roughly 35–40% of the site levelled. This stage finished on 4 November. We are now hoping for rain to help the soil and sand mixture settle.
50 Truckloads of Sirtu Now on Site at Rumah Kambera
Fifty of 100 planned truckloads of sirtu have reached Rumah Kambera. Working from 6 a.m. to 8 p.m., the team receives 25 loads daily. Two more days are expected at that pace. We will then assess whether more material is needed before levelling the 100 piles to make the surface as flat as possible.
A Website for the Future Rumah Kambera Centre
A dedicated website now follows the planned Rumah Kambera Community Socio-Medical Centre in East Sumba. The architectural rendering shows the proposal, while the new microsite explains the centre’s purpose, plans and construction progress. Follow the work as each stage takes shape.
Electricity Reaches the Rumah Kambera Site
Electricity reached the future Rumah Kambera Community Socio-Medical Centre site in Kawangu, East Sumba, a few weeks ago. Its current 2,200-watt connection supports basic construction tasks and provides evening light in the lopo when the team stays overnight on the land during the build.
Three Crosses Near Haray, and a Prayer for What Comes Next
Three wooden crosses stood on a hillside near Haray during our journey to evaluate a school solar installation in East Sumba. Alex stopped to pray for the future of Fair Future Foundation, the Rumah Kambera Community Socio-Medical Centre, and the people the teams still need to reach.
Rumah Kambera | CHF 19,000 for the Future Centre
Two donations totalling CHF 19,000 bring funding for the future Rumah Kambera Community Socio-Medical Centre to nearly 40% of the total needed. In Kawangu, East Sumba, construction is under way on a site planned for medical care, training and logistics serving remote village communities.
Rumah Kambera 2.0 Drilling Begins | Fair Future
Rumah Kambera 2.0 drilling marks the first physical step toward Fair Future Foundation’s new socio-medical base in East Sumba. After two days of work, fresh water was found, making future construction, field life, and patient care possible on the site.
Kawangu topographic survey | Building from measured ground
A topographic survey has been completed at the future FFF-KBI Sumba HQ site in Kawangu. Elevations, contours, roads, drainage and existing features were measured and mapped at 1 to 1000 scale, giving the project a reliable technical base before the next construction phase begins on site.












